SKYTRAIN MILLENNIUM LINE, VANCOUVER, CANADA |
|
 |
|
Description: A 16.5 kilometer elevated guide way extension using match cast segmental precast construction. The heavy reinforcing cages were supported on the bottom and side by over 3,000,000 of GTI Composite Slab Bolster®. |
Owner: RTP 2000 Ltd.
Engineer: Earth Tech
Location: Greater Vancouver, British Columbia, Canada
Contractor: SAR Transit JV
Concrete Supplier: Lafarge Canada Inc.
Precaster: SAR Transit JV
Construction method: Precast concrete
PCI-Certified Precaster: J. DiSanti Concrete Products Inc. |